[Tickets #8510] Re: Export of recurring event with Nth WeekDay is wrong

bugs at horde.org bugs at horde.org
Fri Aug 21 09:01:59 UTC 2009


DO NOT REPLY TO THIS MESSAGE. THIS EMAIL ADDRESS IS NOT MONITORED.

Ticket URL: http://bugs.horde.org/ticket/8510
------------------------------------------------------------------------------
  Ticket             | 8510
  Updated By         | lst_hoe02 at kwsoft
  Summary            | Export of recurring event with Nth WeekDay is wrong
  Queue              | Kronolith
  Version            | 2.3.1
  Type               | Bug
  State              | Feedback
  Priority           | 1. Low
  Milestone          |
  Patch              | 1
  Owners             |
------------------------------------------------------------------------------


lst_hoe02 at kwsoft (2009-08-21 05:01) wrote:

The used calculation is only wrong for the last 7 days of the month  
excluding the same weekday as the first monthday is. If one change the  
line 99 in kronolith/lib/tests/recurrence.phpt to use "2009-03-27  
10:00:00" the error should be detectable. The 27.03.2009 is the 4th  
friday in March but the result would be BYDAY=5FR.
The Basic Problem is, that the calculation is based on the weeknumber  
and the result should be the nth weekday which is off for weeks  
continue in the next month.






More information about the bugs mailing list